System operational

Past Incidents

15th August 2022

No incidents reported

14th August 2022

New York, US New York Datacenter Migration

14th August 2022, 9:00 EST

Racks at Coresite NY2 will be disconnected from power, our remaining inventory will be moved and the migration finished. This date could potentially have some equipment moved too if we did not manage to move everything in the prior two days.

13th August 2022

New York, US New York Datacenter Migration

13th August 2022, 9:00 EST

We will be moving equipment from around 10am to 6pm. To minimise downtime we are moving equipment in groups, this means while we move the equipment there will be 30-60 minutes of downtime for your services rather than being down for potentially 8 hours+.

12th August 2022

New York, US New York Datacenter Migration

12th August 2022, 9:00 EST

We will be moving equipment from around 10am to 6pm. To minimise downtime we are moving equipment in groups, this means while we move the equipment there will be 30-60 minutes of downtime for your services rather than being down for potentially 8 hours+.

11th August 2022

New York, US New York Datacenter Migration

11th August 2022, 9:00 EST We will be expanding our current network to connect in our new racks at INAP 2 Enterprise and connect to a new ISP (INAP). Our line with our existing ISP (Cogent) will remain at Coresite NY2 and will be hot cut to a rack that is remaining at Coresite NY2. The second redundancy line with Cognet will be discontinued. These works have the potential to cause 1-2 minute outages or cause periods of increased latency due to distance over the new dark fibre. We will minimise downtime as much as possible.